2025 - LISMORE
Dorroughby
- Civil construction work at Dorroughby to protect a 600DN water main and Raw Water Pump Station from future flooding events.
- Construction of access track
- Removal of bulk material/shaping batters using Leica gps technologies
- Construction of an access track to gain safe access to the bottom of slip.
- Construction of slip face- removal of bulk materials to design level.
- Drilling and installation of soil nails for slip stabilisation
- Formwork and steel placement
- Shotcrete application- the use of a concrete line pump and boom lift to apply shotcrete
- Installation of gabion rock filled reno mattresses
- Placing and filling reno mattress