2026 - TWEED SHIRE COUNCIL
Rowlands Creek
- Install environmental controls.
- Installation of frog fence to protect the giant barred frog.
- Construction of a side access road for residents during construction
- Demolish
- Install coffer dam
- Excavation
- Piling platform constructed
- Works out of the water level.
- Prefabricated steel was placed and concrete poured to complete piling.
- Piling platform removed and binding slab/working platform was poured.
- Water Pumping
- Tweed Shires first "Inquick bridge" structures were delivered & installed to site with preformed abutments placed on biding slab and poured in-situ.
- Pouring of bridge deck and castellated curb.
- Placement of sub grade materials in preparation for approach slabs
- Forming and pouring of approach slabs to bridge knowledge design.
- Placement of granular pavement.